Description: PT Duta Sugar Sea Water Injection Project is a special project supported by GPA Engineering in 2015, consisting of 2 stage pumping system. In the first stage, sea water is transferred from the sea to the retain pond at 1000m3/hr vs 15 m. In the second stage, water is transfered from the retain pond to the condenser at 1000 m3/hr vs 40 m. As there is a negative suction from the sea of approximately 2m, an auto-priming system is included for the suction pipe priming.

​

Client: PT. Duta Sugar International

​

Pumps Used: 6 Units of Split Case Pumps

​

Medium: Near-shore seawater

 